Here Is Information On South Hill VA Modular Homes

shares |

By Anthony Jones


Modular homes are types of houses that are constructed in a factory environment in form of modules. Each module is made separately and independently prior to being joined together to make the complete house. The quality control department of the manufacturer pays close attention to the production process to ensure that standards are met. Because of strict quality control, all modules end up being of the same quality. This is what South Hill VA modular homes entail.

Unlike traditionally constructed homes, modular homes are not affected by weather elements. As such, unfavorable weather does not interfere with the process of constructing these homes. This leads to faster production of these houses. The construction process can still take place at night by having a nightshift crew working at night. This also contributes to faster production.

A number of factors like bad weather usually affect construction of normal houses. For instance, the construction process has to be stopped when a storm comes. In addition, most normal houses are constructed from morning hours to evening hours after which the crew leaves the site and resumes work the following day. This makes the construction process to take longer. As such, several months may be required to construct a single home.

A lot of people are going for modular houses due to the ease associated with their construction. The modules can be produced fast with the mean production period being four weeks. After completion, they are covered with suitable material so as to protect them from damage from the elements of weather while in transit. They are then taken to the construction site to be installed and finished up.

A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.

Although the average time it takes to construct these structures is four weeks, the duration can vary a lot. The duration is affected by several factors such as the design of the structure. Complicated designs usually take longer because there is a lot of planning and designing involved in their production. Also, the size of the structure will matter because those that have more modules need more time to produce.

The process of installation requires additional time so as to be completed. The installation may be carried out by local builders or the production firm. A majority of firms prefer to install the structures themselves but this decision lies with the homeowner. The client has to decide if they prefer the manufacturer to do the installation too or if they prefer an external contractor. This decision can be influenced by various factors.

People should understand that there is a big difference between mobile and modular houses. One difference is that modular homes cannot be moved from one place to another as is the case with mobile homes. Modular houses are not mobile because the installation is done on a permanent foundation, which prevents them from moving.